An advance power shutoff notice gives healthcare facilities time to prepare. How that time is used can affect whether refrigerated inventory stays protected, staff remain connected, and essential services continue.
On October 16, 2026, the California Department of Public Health issued an advisory reminding healthcare facilities that utilities may proactively turn off electricity during a Public Safety Power Shutoff (PSPS) event. These shutoffs are intended to reduce wildfire risk during dangerous conditions.
For pharmacies, clinics, laboratories, and surgery centers, a shutoff notice should trigger a coordinated response. Here is where to start.
Confirm the Notice and Assign Responsibility
Review the utility’s notice to confirm the affected service address, anticipated shutoff window, and where updates will be posted. Assign someone to monitor those updates and communicate changes to the team.
Use the available notice period to review your facility’s emergency procedures. Confirm who will check backup systems, monitor refrigerated storage, contact patients, and make decisions about continuing or rescheduling services.
Include after-hours coverage. If the shutoff begins after closing, staff should know who receives alerts and who can access the building.
Verify Which Equipment Has Backup Power
Walk through the facility’s priority equipment and confirm how each device will receive power.
A pharmacy may need to support medication refrigerators, dispensing workstations, and communications equipment. A laboratory may need to protect specimen storage and instruments supporting active processes. A surgery center should evaluate its schedule and equipment needs with clinical and facilities personnel.
If a generator serves the building, verify which circuits it supports. If battery backup systems protect individual devices, confirm that the intended equipment is connected and that the systems are operating normally.
Check supporting equipment as well. Remote temperature alerts may depend on a monitoring gateway, router, or other network device that needs its own power source.
Check System Readiness and Available Runtime
Before the shutoff window, check battery charge levels, system indicators, and any maintenance alerts according to manufacturer instructions.
Confirm that the connected load matches the equipment used to determine runtime. Adding another refrigerator or workstation can reduce how long the system operates.
Compare available runtime with your response plan. Identify when staff would need to arrange alternate storage, relocate an activity, or shut equipment down safely if utility service remains unavailable. Establish those decision points before the outage begins.
Prepare Refrigerated Inventory and Alternate Storage
For facilities storing vaccines or refrigerated medications, confirm that temperature monitoring will continue throughout the interruption.
Review the applicable storage and emergency handling procedures for the products on hand. Make sure staff have access to contact information, packing supplies, transportation arrangements, and an appropriate alternate storage location.
Call the receiving location to confirm availability and capacity. A nearby facility may be affected by the same shutoff.
Battery backup can provide time to respond, but the plan should account for an outage that lasts longer than the system’s available runtime.
Review Operations Before the Shutoff Begins
Decide which services can continue with the equipment and power available. Communicate scheduling changes early and make essential contact information and procedures accessible if computers or internet service become unavailable.
When utility power returns, follow established procedures to check equipment status, review temperature records, and confirm that backup batteries are recharging.
An advance shutoff notice is an opportunity to put the facility’s power continuity plan into action. Clear responsibilities, verified connections, and realistic runtime expectations help staff use that time effectively.
Contact the Medi-Products team to review your equipment and runtime requirements and custom-tailor a battery backup system suited to your facility.